The R-Permit application process begins before an online form is submitted. A useful application record explains the private encroachment, identifies the exact location, and connects the description to sketches, photographs, and property information. Additional materials depend on the project.

Have a project-specific R-Permit question?Discuss Your R-Permit Project →
Current BOE starting point: According to the current Los Angeles Bureau of Engineering Permits Manual, applicants generally need a completed application, a copy of the grant deed, a project sketch, photographs, and applicable fees. A lease agreement applies to sidewalk dining, and additional documentation may be required for other project types.

Steps 1–5: prepare the project record

1. Define the project scope

Describe what is existing, what is proposed, and which private item or use would occupy the public right-of-way. A scope such as “improve frontage” is too broad. Identify the actual planter, fence, dining area, projection, bridge, conduit, or other encroachment.

2. Identify the site and location

Provide the property address or nearest useful location. The record may also need the adjacent street, legal description, engineering district, council district, property line, and the relationship between the proposed work and the curb, sidewalk, or roadway.

3. Prepare the project description

The description should be specific enough for City reviewers, future inspection, or enforcement staff to understand the encroachment. Include its purpose, materials, dimensions, and site relationship when known. Keep the application, sketch, and plans consistent.

4. Prepare a sketch and photographs

Current processing guidance calls for a small-format sketch showing the encroachment with dimensions, elevations, details, a north arrow, and adjacent street names. Photographs should show the relevant frontage and conditions from both sides of the property near the encroachment.

Technical procedures can require more detail. A sidewalk encroachment sketch, for example, may need to show property lines and existing items such as streetlights, utility poles, hydrants, trees, parking meters, signs, and street furniture.

5. Gather property documentation

A grant deed supports the ownership and legal-description portion of the record. A title report or survey may be relevant or requested. For sidewalk dining, BOE’s general online requirements identify a lease agreement when the applicant is a lessee. Other project types can have different ownership-document needs.

Step 6: submit the application

The applicant submits the project information and attachments through the applicable BOE process. City staff review the record for valid and complete information, confirm location and district details, and identify missing materials. The application may be marked incomplete or waiting on an applicant response if information is missing.

Submitting does not mean the encroachment is approved. It starts the applicable review and provides the basis for the City to identify conditions, fees, and additional coordination.

Steps 7–8: address requirements and conditions

7. Respond to the Revocable Permit Requirements letter

The requirements list is used to create the Revocable Permit Requirements letter, often called the RPR letter. It identifies conditions and missing items the applicant must address. Depending on the project, these can involve revised drawings, fees, insurance, a Waiver of Damages, maintenance obligations, other department approvals, or related permits.

Organize the response by requirement rather than sending disconnected documents. Track who owns each item, which version was submitted, and what still needs City confirmation.

8. Complete applicable project conditions

Conditions are project-specific. A design professional may need to revise plans; an owner may need to execute documents; an insurance provider may need to provide evidence of coverage; or another agency may need to review part of the proposal. Construction or installation can require an A-, B-, or Excavation Permit.

Do not assume a requirement is satisfied until the responsible City reviewer confirms it. Independent coordination can help organize the work, but it cannot waive or approve a City condition.

Step 9: City permit action

Permit issuance occurs only after the applicable information has been approved, required conditions have been met, and the appropriate fees have been addressed. The City may also deny or cancel an application under its procedures.

There is no responsible way to promise a processing time. Project complexity, completeness, field review, related approvals, applicant response, and City workload can affect the path.

Prepare for the next stage with the Los Angeles R-Permit requirements guide and understand the potential relationship among an R-Permit, A-Permit, and B-Permit.

Need help organizing the scope, documents, or next steps?Explore R-Permit Support →

Common questions

Can I apply before every technical detail is complete?

The appropriate level of detail depends on the proposal. An incomplete record can lead to requests for more information, so confirm what the applicable technical procedure expects.

Does paying a fee guarantee approval?

No. R-Permits are discretionary, and payment does not guarantee issuance.

Can the project scope change after submission?

Changes should be disclosed and coordinated. A material scope change can require additional investigation, revised requirements, or a new application and fee.

Official Source

This independent guide summarizes general procedures and is not an official application instruction. Confirm the current process, forms, documents, fees, and sequencing with the applicable City of Los Angeles office.

Related articles

Have a Los Angeles project involving the public right-of-way?

Application and documentation support can help organize the project record and open questions.

Discuss Your R-Permit Project View All Resources